The blasting vibration in the course of Shuangshan tunnel excavation in Chongqing is introduced, in order to control the impact of blasting vibration for mountaintop building. Various measures, such as cutting down the biggest pack amount of explosive in single segment, increasing the bore quantity for reducing the earthquake wave and choosing the suitable device and instrument are adopted. During the construction, a lot of blasting vibration monitoring points are laid at the top of Shuangshan. The obtained monitoring data shows that the vibration influence on the houses at the top of Shuangshan is very light, so the control technologies of blasting vibration are applied successfully, and the control technique will be a model to the following similar projects.