Common Engineering Geological Problems and Countermeasures in Loessland
详细信息   
摘要
This paper makes an approach to main engineering geological problems in loessland based on data on engineering exploration of the Weilonghete Bridge of the Xi’an-Datong Railway and puts forwards some countermeasures.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.