Cryogenic pressure temperature swing adsorption process for natural gas upgrade
详细信息    查看全文
文摘

Isotherms of CH4 and CO2 on binderless 13X zeolite at 180–473 K, up to 80 bar.

Cryo-PTSA process design for LNG production.

Dynamic simulations considering GERG-2008 equation of state.

CH4 recovery of 90.7% and a product stream with 41.8 ppm of CO2 in CH4 is obtained.

Productivity of 100.1 mol/kg h and power consumption of 2.2 MW is obtained.

NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.