Bromide and chloride tracer application to determine sufficiency of plot size and well depth placement to capture preferential flow and solute leaching
15 m × 15 m plot size sufficient to capture preferential flow.
•
Bromide breakthrough occurred directly below plots to which bromide was applied.
•
Well screens must intersect water table to capture agricultural chemicals.
•
Chloride was a poor tracer in this area due to high background concentrations.
•
Sampling should be done all year to account for the time to reach the water table.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.