In-orbit assembly mission for the Space Solar Power Station
详细信息    查看全文
文摘

Launch vehicle, orbital transfer and space robots are needed in GEO assembly mission.

Assembly procedures for different modules utilizing 2 kinds of robots is presented.

Sequence and route planning optimization gives the optimal time and energy cost.

Antenna modules cost up to 45% total consumption because weight impacts the most.

The planning program is reliable for assembly mission quantitative evaluation.

NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.