An energetic and economic analysis of eleven industrial CHP plants was performed.
•
Both design and experimental data have been considered.
•
The effect of national incentives on economic profitability has also been investigated.
•
In the design phase, the simple payback time is usually underestimated.
•
Economic incentives allow an average SPB reduction of about 15–20%.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.