Pathways of 3-biofules (hydrogen, ethanol and methane) production from petrochemical industry wastewater via anaerobic packed bed baffled reactor inoculated with mixed culture bacteria
文摘
class="listitem" id="list_l0005">
class="label">•

Bio-energy production from MEG contaminated wastewater via AnPBBR, was assessed.

class="label">•

Maximum concurrent H2 and CH4 production of 6.57 and 3.57 L/d were obtained.

class="label">•

Maximum ethanol generation of 237.13 mg/L was observed at a HRT of 9 h.

class="label">•

At OLRs up to 4 gCOD/L/d, MEG biodegradability of 71–98% was achieved.

class="label">•

AnPBBR economically achieved shorter payback period (6.25 y), compared to ABR.

NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.