Two multivariate project schedule control metrics are presented using well-known EVM metrics.
•
Principal component analysis is used to build a correlation reference and to test the multivariate metrics.
•
A large simulation study compares the novel control approach with the current best practice.
•
Improvements are obtained in comparison with the traditional project control approach.