Scheduling with minimizing the total resource consumption.
•
A branch-and-bound algorithm to search for the optimal solution.
•
A lower bound based on job preemption.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.