Fixed capital investment estimation for modular production plants
文摘
A method for fixed capital investment estimation for modular plants was developed. A quantification of expectable cost changes is proposed based on literature data. Cost changes resulting from modular design are implemented in the method. Different boundary conditions for plant construction can be considered. Modular and non-modular plants can directly be compared with the same methodology.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.