The problem of Conservation Planning over time by considering spatial connectivity of the selected sites. We propose a multi-period MIP model for the dynamic reserve network design problem. It selects a fully connected subset of sites for a cost-effective conservation.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.