Achieving full connectivity of sites in the multiperiod reserve network design problem
详细信息    查看全文
文摘
The problem of Conservation Planning over time by considering spatial connectivity of the selected sites. We propose a multi-period MIP model for the dynamic reserve network design problem. It selects a fully connected subset of sites for a cost-effective conservation.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.