Launch vehicle, orbital transfer and space robots are needed in GEO assembly mission.
•
Assembly procedures for different modules utilizing 2 kinds of robots is presented.
•
Sequence and route planning optimization gives the optimal time and energy cost.
•
Antenna modules cost up to 45% total consumption because weight impacts the most.
•
The planning program is reliable for assembly mission quantitative evaluation.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.