In-orbit assembly mission for the Space Solar Power Station
详细信息    查看全文
文摘
m" id="list_li0005">

Launch vehicle, orbital transfer and space robots are needed in GEO assembly mission.

Assembly procedures for different modules utilizing 2 kinds of robots is presented.

Sequence and route planning optimization gives the optimal time and energy cost.

Antenna modules cost up to 45% total consumption because weight impacts the most.

The planning program is reliable for assembly mission quantitative evaluation.

NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.