Optimal solutions for a dock assignment problem with trailer transportation
详细信息    查看全文
文摘
This paper presents a model for a dock assignment problem, where trailers need to be assigned to gates for a given period of time for loading or unloading activities. The parking lot is used as a buffer zone. Transportation between the parking lot and the gates is performed by additional resources called terminal tractors. The problem is modeled as a three-stage flexible flow shop, where the first and the third stage share the same identical parallel machines and the second stage consists of a different set of identical parallel machines. We examine multiple integer-programming formulations for the parallel-machine model in stage two and for the three-stage flow shop and we provide extensive computational results. Our goal is to explore the limits of the instance sizes that can be solved to guaranteed optimality within acceptable running times using integer programming.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.