Engineering Cementing Solution for Hutubi Underground Gas Storage Project
详细信息    查看全文 | 下载全文 | 推荐本文 |
  • 作者:X.ZhangS.TaoutaouY.GuoY.ANS.ZhongY.Wang
  • 会议时间:2014-11-01
  • 作者单位:X.Zhang,S.Taoutaou,Y.Guo,Y.AN(Schlumberger)S.Zhong(Xinjiang Oilfield Company, PetroChina)Y.Wang(Xibu Drilling&Engineering Company, PetroChina)
  • 母体文献:2014年地下储气(油)库与LNG技术研讨会论文集
  • 会议名称:2014年地下储气(油)库与LNG技术研讨会
  • 会议地点:北京
  • 主办单位:北京石油学会
  • 语种:chi
摘要
Underground gas storage is an important segment in China' s gas market.Because of the supply and demand misbalance of natural gas, the gas in underground storage is made available during the peak winter season.In the west of China, the Hutubi dry gas field is to be used for underground gas storage with a storage capacity of 4.5× 109 m3.A total of 37 wells will be drilled with 30 natural gas injection/withdrawal wells, 5 observation wells, and 2 water injection wells.
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.