桥梁悬臂浇筑挂篮行走装置对挂篮施工的作用十分显著,结合介休东站站前广场铁路高架桥工程68+116+68连续梁,研发了一套桥梁悬臂浇筑挂篮行走装置,通过由泵站系统提供动力,由千斤顶推动挂篮前行,省时省力,对提升工作效率、确保安全施工有着积极意义.
the effect of bridge cantilever building hanging basket walking device on hanging basket construction is very significant.Combining with the 68+116+68 continuous beam of the railway viaduct project in frontsquare of Jiexiu east station,a set of bridge cantilever construction hanging basket walking device is developed.By providing power by the pumping station system,the hanging basket is pushed forward by the top of the catties,saving time and labor.It is of positive significance to improve work efficiency and ensure safe construction.