连续掘进敞开式全断面岩石掘进机控制系统的研究
详细信息    本馆镜像全文|  推荐本文 |  |   获取CNKI官网全文
摘要
全断面岩石掘进机是现代隧道建设中的重要施工设备之一,本论文根据提出的连续掘进敞开式全断面岩石掘进机工作原理,对控制系统进行方案设计。该方案包括系统选型、硬件电路设计和软件程序编写,并通过计算机仿真进行模拟验证,从而证明方案可行,即能够实现两组推进支撑装置在过渡过程很好的衔接,并在两组推进支撑装置交替作业过程中,保持刀盘推进力的持续稳定,实现刀盘的连续掘进。最后整个工作过程通过触摸屏和上位机组态软件实现现场、远程监控。
Nowadays, Full Face Rock Tunnel Boring Machine has been one of main construction facilities in tunneling industry. The paper introduces the design of control system according to working principle of the Continuous Boring Open Type Full Face Rock Tunnel Boring Machine. The system design includes choice of components, software program and hardware circuit design, and at last through online simulation to prove the system feasibility. The design of control system realizes the good coordination between two sets of thrust and gripper fixtures and constant force on the cutterhead in the transient process, and reaches continual tunneling. The entire process will be monitored by Touch Panel and Position Machine.
引文
[1] 王家騄.国外岩石隧道掘进机纵横谈.电站施工机械,1980,2~3
    [2] 水利部科技推广中心.全断面岩石掘进机.石油工业出版社,2005
    [3] 王浩.敞开式全断面岩石掘进机连续掘进原理的研究:[硕士学位论文].北京:华北电力大学.2006
    [4] 张照煌,李福田.全断面隧道掘进机施工技术.出版地:中国水利水电出版社,2006
    [5] 刘东亮.电液比例技术在盾构推进系统中的应用[J].建筑机械,2005,8:93~95
    [6] 张照煌,叶定海,孙孟莉.全断面岩石掘进机在困难地层中的施工技术.建设机械技术与管理,2005
    [7] 李壮云主编.液压元件与系统第二版.北京:机械工业出版社,2005
    [8] 何於琏.秦岭TB880E型全断面隧道掘进机主机工况分析.铁道工程学报,1998(02)
    [9] 唐健.浅谈TB880E隧道掘进机PLC控制系统故障诊断技术.隧道建设,2003(01)
    [10] 吕建乐.比例控制技术在掘进机工况中的应用.液压与传动,2004(05)
    [11] 廖常初主编.S7-300/400PLC应用技术.北京:机械工业出版社,2005
    [12] 鲁远栋主编.PLC机电控制系统应用设计技术.北京:电子工业出版社,2006
    [13] 王满增,徐明新.TBM故障诊断专家系统的设计与开发.建筑机械,2003(11)
    [14] 王忠诚,王怀章,王晓全.TBM在万家寨隧洞施工中的应用.长春工程学院学报(自然科学版),2001(01)
    [15] G.Girmscheid,叶定海.高性能隧道掘进机领域的最新发展.建筑机械,2002(05)
    [16] 路石.硬岩隧道掘进机(TBM)的掘进速度对工程经济的影响.铁道建筑,2001(06)
    [17] 陈满拾.全断面岩石掘进机的现状与发展.西部探矿工程,1993(02)
    [18] 徐良刊.全断面隧洞掘进机的开发和应用.水利电力机械,1984(04)
    [19] Reilly John,hrrigoni Gianni,Xu Shulin,Grasso Piergiorgio,钱七虎,李兴碧.TBM及其在中国的应用(2).现代隧道技术,2002(02)
    [20] Reilly John,Arrigoni Gianni,Xu Shulin,Grasso Piergiorgio,钱七虎,李兴碧.TBM及其在中国的应用(3).现代隧道技术,2002(03)
    [21] 殷耀章,茅承觉.全断面岩石掘进机施工--全断面岩石掘进机技术讲座之六. 建筑机械,1999(02)
    [22] 茅承觉.全断面岩石掘进机的应用前景.工程机械,1996(08)
    [23] 高晓东.敞开式全断面隧道掘进机通过不良地质地段的措施和施工方法.铁道工程学报,2006(06)
    [24] 高飞.掘进机液压系统常见故障的排除.煤炭技术,2006(08)
    [25] 黎波.螺旋式微型隧道掘进机控制系统的设计:[硕士学位论文].北京:华北电力大学.2005
    [26] 徐明新,马怀祥.如何提高隧道掘进机的作业工时利用率.工程机械,2004(06)
    [27] 刘友元.全断面岩石掘进机机型与主要参数的确定.工程机械,2003(01)
    [28] 叶定海.新型岩石掘进机—CMM.建筑机械,1997(02)
    [29] 谢成泰.全断面掘进机(TBM)在引黄工程中的应用.水力发电,1999(05)
    [30] 薛继洪.隧洞掘进机在引大入秦工程中的应用.四川水力发电,1998
    [31] 苏枢,昝志斌,何际平.断层带的TBM施工[J]山西水利科技,2000
    [32] 李卫兵.TBM在超长隧道施工中的应用研究[D].吉林大学,2005
    [33] S.Pelizza,P.Grasso,徐书林,翟进营.TBM法隧道掘进综述.建筑机械,2002
    [34] 刘瑞庆.不同地质情况下掘进参数的选择标准及经验.建筑机械,2000
    [35] Herrenknecht, Martin; Bappler, Karin. Recent developments in the TBM industry-New and innovative technologies. Proceedings-Rapid Excavation and Tunneling Conference, 17th Rapid Excavation and Tunneling Conference-2005 Proceedings, 2005, 679~688
    [36] Tanimoto, Chikaosa (Dept. of Global Architecture, Graduate School of Eng, Osaka Univ.); Yamanaka, Shunichiro; Tsusaka, Kimikazu; Nakane, Tatsuto; Hirano, Minoru; Kanzaki, Hiroshi; Abe, Suguru; Iwata, Shuichi. A study on cutter wear and mechanical properties of rocks in tunneling with a TBM. Zairyo/Journal of the Society of Materials Science, Japan, v55, n1, January, 2006, 29~36
    [37] Gong, Qiuming (Nanyang Technol. Univ.); Zhao, Jian; Zhang, Xihu. Performance prediction of hard rock TBM tunneling. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, v 23, nSUPPL. 2, July, 2004, 4709~4714
    [38] Lu, Yang; Ma, Ji-Ming; Xu, Qian-Jun; Han, Mo-Ning. TBM in the future of China. Marine Georesources and Geotechnology, v22, n3, July/September, 2004, 185~193
    [39] Tarkoy, Peter J. (Grow Tunneling Corp); Wagner, John. Backing up a TBM. Tunnels and Tunnelling, v20, n10, Oct, 1988, 5
    [40] Wallis, Shani(Tunnels & Tunnelling, London, Engl). FULL FACE TBM FIGHTS THROUGH MIXED GROUND CONDITIONS. Tunnels and Tunnelling, v19, n10, Oct, 1987, 31~34
    [41] Isby, David C. Ghaznavi TBM ready for army service. Jane's Missiles and Rockets, nFEB, February, 2004, 1
    [42] Knight, Gall B. (S. A. Healy Co). TBM EXCAVATION OF ROGERS PASS RAILROAD TUNNEL. Proceedings - Rapid Excavation and Tunneling Conference, v2, 1987, 673~683
    [43] TBM的应用及其有关问题和展望.岩石力学与工程学报,1999(03)
    [44] 祁志,宋宏伟,贾颖绚.全断面掘进机的应用现状与发展前景.建筑机械化,2002(05)
    [45] 茅承觉.全断面岩石掘进机(TBM)选型探讨.建设机械技术与管理,2006(08)
    [46] 习仲伟.我国交通隧道工程及施工技术进展.北京工业大学学报,2005(02)
    [47] 叶飞,黎柯军.隧道掘进机技术及其在我国的发展和应用.中外公路,2006(04)
    [48] 于兰英,唐元宁.TB880E全断面掘进机的总体结构及其分析.建筑机械,1998(05)
    [49] 何晓婷.中国非开挖技术产业发展模式研究.重庆大学,2001
    [50] 张照煌 全断面岩石掘进机及其刀具破岩理论 中国铁道出版社 2003.3
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via email.