设为首页
收藏本站
网站地图
|
English
|
公务邮箱
About the library
Background
History
Leadership
Organization
Readers' Guide
Opening Hours
Collections
Help Via Email
Publications
Electronic Information Resources
常用资源
电子图书
期刊论文
学位会议
外文资源
特色专题
内部出版物
SpringerLink电子期刊(4)
Elsevier电子期刊(8)
在“
Elsevier电子期刊
”中,
命中:
8
条,耗时:小于0.01 秒
在所有数据库中总计命中:
12
条
1.
Guest Editorial to the special issue 鈥淢aritime Logistics鈥?(European Summer Institute 2012)
作者:
Christian
Bierwirth
;
Frank Meisel
刊名:European Journal of Operational Research
出版年:1 June, 2014
2.
Integrated production and intermodal transportation planning in large scale production-distribution-networks
作者:
Frank Meisel
;
Thomas Kirschstein
;
Christian
Bierwirth
关键词:
Intermodal transportation
;
Production planning
;
Environmental goals
;
Branch-and-Cut
;
Multi-objective optimization
;
Pareto-optimal solutions
刊名:Transportation Research Part E: Logistics and Transportation Review
出版年:December, 2013
3.
A unified approach for the evaluation of quay crane scheduling models and algorithms
作者:
Frank Meisel
;
Christian
Bierwirth
关键词:
Container terminal
;
Quay crane scheduling
;
Across model evaluation
;
Benchmark generation
刊名:Computers and Operations Research
出版年:2011
4.
Solutions to the request reassignment problem in collaborative carrier networks
作者:
Susanne Berger
;
Christian
Bierwirth
关键词:
Collaborative planning
;
Electronic exchange platform
;
Auction mechanism
;
Travelling salesman problem with precedence constraints
刊名:Transportation Research Part E: Logistics and Transportation Review
出版年:2010
5.
A survey of berth allocation and quay crane scheduling problems in container terminals
作者:
Christian
Bierwirth
;
Frank Meisel
关键词:
Container terminal operations
;
Berth allocation
;
Quay crane assignment
;
Quay crane scheduling
;
Problem classification
;
Integrated planning
刊名:European Journal of Operational Research
出版年:2010
6.
Heuristics for the integration of crane productivity in the berth allocation problem
作者:
Frank Meisel
;
Christian
Bierwirth
关键词:
Container terminal operations
;
Berth allocation problem
;
Quay crane assignment
;
Crane productivity
;
Squeaky wheel optimization
;
Tabu Search
刊名:Transportation Research Part E: Logistics and Transportation Review
出版年:2009
7.
A heuristic scheduling procedure for multi-item hoist production lines
作者:
Henrik J. Paul
;
Christian
Bierwirth
and Herbert Kopfer
刊名:International Journal of Production Economics
出版年:2007
8.
An efficient genetic algorithm for job shop scheduling with tardiness objectives
作者:
Mattfeld
;
Dirk C.
;
Bierwirth
;
Christian
关键词:
Genetic algorithm
;
Job shop scheduling
;
Tardiness objectives
;
Tunable schedule builder
;
Multi-stage decomposition
刊名:European Journal of Operational Research
出版年:2004
1
按检索点细分(8)
作者(8)
按出版年细分(8)
2027年及以后(1)
2011年(1)
2010年(2)
2009年(1)
2007年(1)
2004年(1)
2000年及以前(1)
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via
email
.