设为首页
收藏本站
网站地图
|
English
|
公务邮箱
About the library
Background
History
Leadership
Organization
Readers' Guide
Opening Hours
Collections
Help Via Email
Publications
Electronic Information Resources
常用资源
电子图书
期刊论文
学位会议
外文资源
特色专题
内部出版物
GSW全文库(1)
CNKI会议论文(2)
CNKI期刊论文0611(6)
中国地质文献-英文(36)
CNKI学位论文(4383)
知网期刊论文(3104)
在“
Elsevier电子期刊
”中,
命中:
49
条,耗时:0.0759623 秒
在所有数据库中总计命中:
7,532
条
1.
Novel Integration of Sustainable and Construction Decisions into the
Design
Bid
Build
Project Delivery Method Using BPMN
作者:
Ahmed K. Ali
a
;
Ralph Badinelli
b
;
ahali@tamu.edu" class="auth_mail" title="E-mail the corresponding author
关键词:
Resource Reuse
;
Decision Support System
;
Sustainable
Design
and Construction
;
BPMN Process Mapping
刊名:Procedia Engineering
出版年:2016
2.
The Use and Performance of Alternative Contracting Methods on Small Highway Construction Projects
作者:
Douglas Alleman
a
;
douglas.alleman@colorado.edu" class="auth_mail" title="E-mail the corresponding author
;
Arthur Antoine
b
;
arthur.antoine@colorado.edu" class="auth_mail" title="E-mail the corresponding author
;
Mia Schrilla
c
;
mia.schrilla@colorado.edu" class="auth_mail" title="E-mail the corresponding author
;
Keith Molenaar
d
;
keith.molenaar@colorado.edu" class="auth_mail" title="E-mail the corresponding author
关键词:
Project delivery
;
small projects
;
highway construction
;
performance factors
;
design
-
build
;
construction manager/general contractor
刊名:Procedia Engineering
出版年:2016
3.
A nested framework for transparency in Public Private Partnerships: Case studies in highway development projects in India
作者:
Chandrima Mukhopadhyay
1
;
chandrima.mukhopadhyay@cept.ac.in" class="auth_mail" title="E-mail the corresponding author
;
chandrimamukho@gmail.com" class="auth_mail" title="E-mail the corresponding author
Author Vitae
关键词:
ASB
;
Adjusted Shadow
Bid
;
BOO
;
Build
-Own-Operate
;
BOT
;
Build
-Operate-Transfer
;
CCL
;
Central Coal Limited
;
CPI
;
Corruption Perception Index
;
DBO
;
Design
-
Build
-Operate
;
DBB
;
Design
-
Bid
-
Build
;
DBFOT
;
Design
-
Build
-Finance-Operate-Transfer
;
DPR
;
Detailed Project Report
;
EIA
;
Environmental Impact Assessment
;
GQ
;
Golden Quadrilateral
;
HREL
;
Hazaribagh Ranchi Expressway Limited
;
IE
;
independent engineers
;
IL&FS
;
Infrastructure Leasing & Finance Services
;
JARDCL
;
Jharkhand Accelerated Road Development Co
刊名:Progress in Planning
出版年:2016
4.
Risks Involved in Using Alternative Project Delivery (APD) Methods in Water and Wastewater Projects
作者:
Pramen P. Shrestha
;
Ph.D.
;
P.E.
a
;
pramen.shrestha@unlv.edu" class="auth_mail" title="E-mail the corresponding author
;
Jacimaria Batista
;
Ph.D.
;
P.E.
b
;
Ruiko Maharjan
c
关键词:
Risk
;
Alternative Project Delivery method
;
Design
Build
;
Construction Management-at-Risk
;
Risks
刊名:Procedia Engineering
出版年:2016
5.
Degrees of freedom and innovations in construction contracts
作者:
Johan Nyströ
;
m
johan.nystrom@vti.se" class="auth_mail" title="E-mail the corresponding author
;
Jan-Eric Nilsson
;
jan-eric.nilsson@vti.se" class="auth_mail" title="E-mail the corresponding author
;
Hans Lind
hans.lind@abe.kth.se" class="auth_mail" title="E-mail the corresponding author
关键词:
Contracting
;
Innovation
;
Design
and
build
;
Design
;
Bid
and
build
刊名:Transport Policy
出版年:2016
6.
Achieving Sustainable Structural Steel
Design
by Estimating Fabrication Labor Cost Based on BIM Data
作者:
Arash Mohsenijam
a
;
Ming Lu
b
;
mlu6@ualberta.ca" class="auth_mail" title="E-mail the corresponding author
关键词:
Steel fabrication
;
Construction industry
;
Regression analysis
;
Worker-hour estimation
刊名:Procedia Engineering
出版年:2016
7.
Build
ing Information Modeling (BIM) Use in Turkish Construction Industry
作者:
Hande Aladag
;
haladag@yildiz.edu.tr" class="auth_mail" title="E-mail the corresponding author
;
Gö
;
khan Demirdö
;
gen
;
Zeynep Isık
关键词:
Information technology (IT) use
;
build
ing information modelling (BIM)
;
construction industry
;
focus group discussion
;
simple multi attribute rating technique (SMART)
刊名:Procedia Engineering
出版年:2016
8.
Study on BIM Utilization for
Design
Improvement of Infrastructure Project
作者:
Masaru Minagawa
a
;
minatororo@gmail.com" class="auth_mail" title="E-mail the corresponding author
;
Shunji Kusayanagi
b
关键词:
Build
ing Information Modelling
;
CALS/EC
;
design
-
bid
-
build
contract
刊名:Procedia Engineering
出版年:2015
9.
Study on Natural Ventilation
Design
Optimization Based on CFD Simulation for Green
Build
ings
作者:
Weihong Guo
a
;
b
;
Xiao Liu
a
;
b
;
lxscut@139.com" class="auth_mail" title="E-mail the corresponding author
;
Xu Yuan
a
关键词:
natural ventilation
;
CFD simulation
;
green
build
ing
;
wind environment
;
architectural
design
optimization
刊名:Procedia Engineering
出版年:2015
10.
Creating Nursing's New Academic Spaces: Making Dreams Come True
作者:
Anne R. Bavier
;
PhD
;
RN
;
FAAN
;
bavier@uta.edu" class="auth_mail" title="E-mail the corresponding author
;
Robert N. Bavier
;
M.Arch.
;
AIA
;
LEED
关键词:
Nursing
;
Education
;
Architecture
;
Facilities
;
Design
;
Dean
;
Architect
刊名:Journal of Professional Nursing
出版年:2016
1
2
3
4
5
按检索点细分(49)
题名(2)
关键词(6)
文摘(33)
按出版年细分(49)
2027年及以后(1)
2016年(11)
2015年(2)
2014年(1)
2013年(5)
2012年(7)
2011年(3)
2009年(5)
2008年(1)
2007年(1)
2006年(2)
2005年(2)
2002年(1)
2001年(1)
2000年及以前(6)
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via
email
.