设为首页
收藏本站
网站地图
|
English
|
公务邮箱
About the library
Background
History
Leadership
Organization
Readers' Guide
Opening Hours
Collections
Help Via Email
Publications
Electronic Information Resources
常用资源
电子图书
期刊论文
学位会议
外文资源
特色专题
内部出版物
CNKI学位论文(324)
知网期刊论文(127)
在“
Elsevier电子期刊
”中,
命中:
26
条,耗时:0.0739625 秒
在所有数据库中总计命中:
451
条
1.
Priority-based heuristics for the
multi
-skill resource constrained project scheduling problem
作者:
Bernardo F. Almeida
;
a
;
bernardo.almeida@alunos.fc.ul.pt" class="auth_mail" title="E-mail the corresponding author
;
Isabel Correia
b
;
isc@fct.unl.pt" class="auth_mail" title="E-mail the corresponding author
;
Francisco Saldanha-da-Gama
a
;
fsgama@fc.ul.pt" class="auth_mail" title="E-mail the corresponding author
关键词:
Project scheduling
;
Multi
-
skilled
resources
;
Parallel scheduling heuristic
;
Activity grouping
;
Resource weight
刊名:Expert Systems with Applications
出版年:2016
2.
Off-site construction optimization: Sequencing
multi
ple job classes with time constraints
作者:
Mehrdad Arashpour
a
;
mehrdad.arashpour@rmit.edu.au" class="auth_mail" title="E-mail the corresponding author
;
Ron Wakefield
a
;
ron.wakefield@rmit.edu.au" class="auth_mail" title="E-mail the corresponding author
;
Babak Abbasi
b
;
babak.abbasi.maqsood@rmit.edu.au" class="auth_mail" title="E-mail the corresponding author
;
E.W.M. Lee
c
;
ericlee@cityu.edu.hk" class="auth_mail" title="E-mail the corresponding author
;
James Minas
d
;
minasj@newpaltz.edu" class="auth_mail" title="E-mail the corresponding author
关键词:
Building operations
;
Construction project management
;
Lean construction
;
Minimax decision rule
;
Multi
-
skilled
resources
;
Off-site production
;
Operations research optimization
;
prefabrication and precast
;
Productivity and performance measures
;
Process integration
;
Scheduling theory
刊名:Automation in Construction
出版年:2016
3.
A
multi
-phased QFD based optimization approach to sustainable service design
作者:
Md. Maruf Hossan Chowdhury
;
marufhossan@gmail.com" class="auth_mail" title="E-mail the corresponding author
;
Mohammed A. Quaddus
m.quaddus@curtin.edu.au" class="auth_mail" title="E-mail the corresponding author
关键词:
Service design
;
Sustainability
;
Barriers
;
Mitigation strategies
;
Fuzzy-QFD
刊名:International Journal of Production Economics
出版年:2016
4.
Understanding writing strategy use from a sociocultural perspective: The case of
skilled
and less
skilled
writers
作者:
Xiao Lei
michellelei@126.com" class="auth_mail" title="E-mail the corresponding author
flxlei@scut.edu.cn" class="auth_mail" title="E-mail the corresponding author
关键词:
Activity theory
;
Writing strategies
;
Internalisation
;
Imitation
刊名:System
出版年:2016
5.
The impact of fixed and variable costs in a
multi
-skill project scheduling problem: An empirical study
作者:
Isabel Correia
a
;
isc@fct.unl.pt" class="auth_mail
;
Francisco Saldanha-da-Gama
b
;
fsgama@fc.ul.pt" class="auth_mail
关键词:
Project scheduling
;
Multi
-
skilled
resources
;
Cost minimization
刊名:Computers and Industrial Engineering
出版年:June 2014
6.
The shift minimisation personnel task scheduling problem: A new hybrid approach and computational insights
作者:
Pieter Smet
;
pieter.smet@cs.kuleuven.be" class="auth_mail
;
Tony Wauters
tony.wauters@cs.kuleuven.be" class="auth_mail
;
Mihail Mihaylov
mmihaylo@vub.ac.be" class="auth_mail
;
Greet Vanden Berghe
greet.vandenberghe@cs.kuleuven.be" class="auth_mail
关键词:
Heuristics
;
Mathematical programming
;
Scheduling
刊名:Omega
出版年:July, 2014
7.
Augmented heuristic algorithm for
multi
-
skilled
resource scheduling
作者:
Narongrit Wongwai
;
a
;
narongrit_b2@hotmail.com
;
Suphawut Malaikrisanachalee
a
关键词:
Project scheduling
;
Multi
-
skilled
resource
;
Resource management
;
Resource allocation
;
Project management
刊名:Automation in Construction
出版年:2011
8.
The effects of schedule-driven project management in
multi
-project environments
作者:
K. Yaghootkar
a
;
N. Gil
;
;
a
;
;
nuno.gil@mbs.ac.uk
关键词:
Multi
-project organizations
;
Schedule-driven management
;
Product development projects
;
Resource allocation
;
System dynamics
刊名:International Journal of Project Management
出版年:2012
9.
A knowledge-based evolutionary assistant to software development project scheduling
作者:
Virginia Yannibelli
;
a
;
b
;
vyannibe@exa.unicen.edu.ar
;
Analí
;
a Amandi
a
;
b
;
amandi@exa.unicen.edu.ar
关键词:
Project scheduling
;
Software projects
;
Human resource assignment
;
Multi
-
skilled
resources
;
Heterogeneous effectivities
;
Genetic algorithms
刊名:Expert Systems with Applications
出版年:2011
10.
Pressure ulcers in Israel
作者:
E. Jaul
;
jaul@zahav.net.il
关键词:
Pressure ulcers
;
Comprehensive and
multi
disciplinary
;
Assessment and management
;
Skilled
nursing department
刊名:European Geriatric Medicine
出版年:2011
1
2
3
按检索点细分(26)
关键词(4)
文摘(21)
按出版年细分(26)
2027年及以后(3)
2016年(4)
2012年(1)
2011年(3)
2009年(2)
2008年(2)
2006年(2)
2005年(1)
2004年(1)
2002年(1)
2001年(1)
2000年(1)
2000年及以前(4)
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via
email
.