设为首页
收藏本站
网站地图
|
English
|
公务邮箱
About the library
Background
History
Leadership
Organization
Readers' Guide
Opening Hours
Collections
Help Via Email
Publications
Electronic Information Resources
常用资源
电子图书
期刊论文
学位会议
外文资源
特色专题
内部出版物
GSW全文库(13)
馆藏书目(6)
万方学术会议(1)
CNKI学位论文(28256)
知网期刊论文(18902)
中国地质文献-英文(2)
Springer电子图书(60)
CNKI会议论文(24)
CNKI期刊论文0611(37)
万方学位论文(6)
在“
Elsevier电子期刊
”中,
命中:
3,835
条,耗时:0.0339836 秒
在所有数据库中总计命中:
47,307
条
1.
A realistic variant of bi-objective unrelated
parallel
machine
scheduling problem: NSGA-II and MOACO approaches
作者:
Mojtaba Afzalirad
;
Javad Rezaeian
;
j_rezaeian@ustmb.ac.ir
关键词:
Unrelated
parallel
machine
scheduling
;
Machine
eligibility restrictions
;
Precedence constraints
;
Non-dominated sorting genetic algorithm
;
Multi-objective ant colony optimization
刊名:Applied Soft Computing
出版年:2017
2.
Minimizing total earliness and tardiness through unrelated
parallel
machine
scheduling using distributed release time control
作者:
Chen-Yang Cheng
a
;
cycheng@ntut.edu.tw
;
Lu-Wei Huang
b
关键词:
Unrelated
parallel
-
machine
(PM)
;
Total earliness and tardiness
;
Release time control
;
Genetic algorithm (GA)
刊名:Journal of Manufacturing Systems
出版年:2017
3.
Selection of cutting conditions for power constrained
parallel
machine
scheduling
作者:
Yi-Chi Wang
;
Ming-Jun Wang
;
Sung-Chi Lin
关键词:
Cutting conditions
;
Parallel
machine
scheduling
;
Power demand
;
Genetic algorithm
刊名:Robotics and Computer-Integrated Manufacturing
出版年:2017
4.
FPTAS for the two identical
parallel
machine
problem with a single operator under the free changing mode
作者:
Pierre Baptiste
a
;
pierre.baptiste@polymtl.ca" class="auth_mail" title="E-mail the corresponding author
;
Djamal Rebaine
;
b
;
Djamal_Rebaine@uqac.ca" class="auth_mail" title="E-mail the corresponding author
;
Mohammed Zouba
a
;
mohammed.zouba@polymtl.ca" class="auth_mail" title="E-mail the corresponding author
关键词:
FPTAS
;
Free changing mode
;
Identical
parallel
machine
s
;
Operator
刊名:European Journal of Operational Research
出版年:2017
5.
Approximation schemes for
parallel
machine
scheduling with non-renewable resources
作者:
Pé
;
ter Gyö
;
rgyi
a
;
b
;
gyorgyi.peter@sztaki.mta.hu
;
Tamá
;
s Kis
;
b
;
kis.tamas@sztaki.mta.hu
;
kis.tamas@yahoo.com
关键词:
Scheduling
;
Parallel
machine
s
;
Non-renewable resources
;
Approximation schemes
刊名:European Journal of Operational Research
出版年:2017
6.
Extreme learning
machine
with a deterministic assignment of hidden weights in two
parallel
layers
作者:
Pablo A. Henrí
;
quez
a
;
pabhenriquez@alumnos.uai.cl
Author Vitae
;
Gonzalo A. Ruz
a
;
b
;
gonzalo.ruz@uai.cl
Author Vitae
关键词:
Extreme learning
machine
;
Low-discrepancy points
;
Parallel
layers
;
Regression
;
Classification
刊名:Neurocomputing
出版年:2017
7.
Scheduling nonpreemptive jobs on
parallel
machine
s subject to exponential unrecoverable interruptions
作者:
Alessandro Agnetis
a
;
agnetis@dii.unisi.it
;
Paolo Detti
b
;
detti@dii.unisi.it
;
Patrick Martineau
c
;
patrick.martineau@univ-tours.fr
关键词:
Unrecoverable interruptions
;
Parallel
machine
s scheduling
;
NP-hardness
;
Exact and heuristic algorithms
刊名:Computers & Operations Research
出版年:2017
8.
Two-agent scheduling on a single
parallel
-batching
machine
with equal processing time and non-identical job sizes
作者:
Jun-Qiang Wang
;
a
;
b
;
wangjq@nwpu.edu.cn
;
Guo-Qiang Fan
a
;
b
;
Yingqian Zhang
c
;
Cheng-Wu Zhang
a
;
b
;
Joseph Y.-T. Leung
d
关键词:
Scheduling
;
Heuristics
;
Parallel
-batching
machine
;
Two-agent scheduling
;
NP-hardness
刊名:European Journal of Operational Research
出版年:2017
9.
Scheduling unrelated
parallel
batch processing
machine
s with non-identical job sizes and unequal ready times
作者:
José
;
Elias C. Arroyo
a
;
jarroyo@dpi.ufv.br
;
Joseph Y.-T. Leung
b
;
c
;
leung@njit.edu
关键词:
Scheduling
;
Unrelated
parallel
batch
machine
s
;
NP-hard
;
Makespan
;
Heuristics
刊名:Computers & Operations Research
出版年:2017
10.
Scheduling identical
parallel
machine
s with tooling constraints
作者:
Andreza Cristina Beezã
;
o
;
a
;
andreza.beezao@gmail.com" class="auth_mail" title="E-mail the corresponding author
;
andreza@icmc.usp.br" class="auth_mail" title="E-mail the corresponding author
;
Jean-Franç
;
ois Cordeau
b
;
jean-francois.cordeau@hec.ca" class="auth_mail" title="E-mail the corresponding author
;
Gilbert Laporte
c
;
gilbert.laporte@cirrelt.ca" class="auth_mail" title="E-mail the corresponding author
;
Horacio Hideki Yanasse
d
;
horacio.yanasse@unifesp.br" class="auth_mail" title="E-mail the corresponding author
关键词:
Flexible manufacturing systems
;
Parallel
machine
s
;
Sequence-dependent setup times
;
Tooling constraints
;
Adaptive large neighborhood search
刊名:European Journal of Operational Research
出版年:2017
1
2
3
4
5
6
7
8
9
按检索点细分(3835)
题名(657)
关键词(658)
文摘(2839)
NGLC 2004-2010.National Geological Library of China All Rights Reserved.
Add:29 Xueyuan Rd,Haidian District,Beijing,PRC. Mail Add: 8324 mailbox 100083
For exchange or info please contact us via
email
.